In the Elastico 10 fall-protection system, correct cable tensioning is closely linked to the elastic behaviour of the post. The line is not simply tensioned between two anchor points: the spring integrated into the system is preloaded during installation and subsequently released to bring the cable into the configuration required for use.
Contents
- Tensioning does not simply mean “pulling” the cable
- The integrated spring directly contributes to the line configuration
- Cable length depends on the anchor configuration
- Post spacing also affects the behaviour of the line
- Integrated shock absorber and behaviour in the event of a fall
- The post shock absorber does not normally replace the operator’s energy absorber
- Tensioning must develop along straight sections
- Component checks maintain effective tensioning
- Elastico 10: tensioning and deformability as part of the same system
- Frequently asked questions about Elastico 10 cable tensioning
This principle distinguishes Elastico 10 from a line created using a completely rigid connection. Deformability is part of the system’s operation and must be considered together with the distance between the posts, the overall cable length and the available clearance below the working level.
The integrated shock absorber therefore performs two functions: it contributes to cable tensioning and affects the behaviour of the system in the event of a fall.
Tensioning does not simply mean “pulling” the cable
A flexible fall-protection line must maintain a controlled geometry between the posts.
With Elastico 10, this condition is achieved through a sequence in which the elastic system of the post is first preloaded and then released.
Before the cable is installed, the spring is compressed by adjusting the central screw at the top of the post. The specified preload is between 25 and 30 mm.
With the spring in this position, the cable can be arranged between the different posts and its alignment adjusted. The cable is then passed through the upper rollers and the central wheel of the post until it reaches the next point along the line.
During this stage, sufficient tension must be maintained to keep cable sag within 4 cm of the horizontal.
The following diagram shows the cable configuration between two Elastico 10 posts, with post spacing of between 3 and 10 metres and a maximum sag of 4 cm from the horizontal.

Only after the cable has been positioned and secured is the spring preload released. This step brings the line to the tensioned condition required for use.
The integrated spring directly contributes to the line configuration
The elastic system is therefore not a component that comes into operation only in the event of a fall.
The same spring is already involved during installation of the line, because its initial compression allows the cable to be positioned and its subsequent release tensions the cable.
This means that the cable and shock absorber cannot be considered as two independent elements.
The initial cable geometry must be compatible with the travel of the elastic system and with the distance between the posts. A cable installed without taking these parameters into account would not reproduce the configuration specified for Elastico 10.
Installation also requires the cable to be secured to the posts with a tightening torque of 100 Nm, while during preparation of the section the cable is pulled with a force of 50 kg, keeping the sag within the specified limit.
Cable length depends on the anchor configuration
The overall cable length must also be defined before tensioning.
The amount of cable required does not simply correspond to the linear distance between the first and last posts, because it must also include the additional length required at the end posts and any intermediate posts.
For Elastico 10, the cable length is determined using:
X + 2L + (0.520 m × number of intermediate posts)
where X represents the distance between the first and last Tubo Ancora and L, equal to 1.64 m, is the coefficient specified for each end post.
The formula highlights an important aspect from a design perspective: anchor distribution and cable length are part of the same configuration.
If the number of posts changes, or the overall length of the line changes, the amount of cable required to create it also changes.
Post spacing also affects the behaviour of the line
The distance between two consecutive Elastico 10 posts must be between 3 and 10 metres.
This value does not only determine how many anchor points are required along the precast element. It also affects the vertical deflection that may develop in the event of a fall.
With post spacing of 3 metres, the vertical deflection specified for the line is approximately 0.40 m. When the spacing is increased to 10 metres, the value reaches approximately 1.34 m.
Between these two limits, deflection progressively increases as the distance between the posts increases.
It is therefore clear why cable tensioning cannot be assessed separately from the geometry of the line: two configurations using the same components but different post spacing do not develop the same vertical movement when subjected to a load.
Integrated shock absorber and behaviour in the event of a fall
The deformability of Elastico 10 is not a secondary effect of the system.
The shock absorber integrated into the post is specifically designed to perform two functions: cable tensioning and shock absorption in the event of a fall.
When the line is subjected to a load, its behaviour therefore depends not only on the cable, but on the interaction between the cable, posts and elastic system.
For this reason, the available clearance below the working level must also be checked by taking the deformation of the line into account.
For Elastico 10, a minimum clearance of 3 metres must be available below the walking surface, assessed in relation to post spacing, system deflection and the fall-arrest device being used.
A line with greater post spacing develops greater vertical deflection than a configuration with posts positioned closer together.
The post shock absorber does not normally replace the operator’s energy absorber
The presence of the shock absorber integrated into Elastico 10 must not be confused with the energy absorber used in the operator’s personal system.
In the standard configuration, the operator is connected to the line using a device equipped with an energy absorber compliant with EN 355.
The two elements therefore act on different parts of the fall-protection system: the integrated shock absorber belongs to the Elastico 10 line, while the individual energy absorber belongs to the system used by the operator to connect to the line.
A specific condition is provided in which Elastico 10 can be used with a 1-metre lanyard without an energy absorber: a working height of 3 metres and post spacing of less than 4 metres. In this configuration, the damping capacity of the integrated system comes directly into play.
Outside this specific condition, the presence of the shock absorber in the post does not eliminate the use of the energy absorber required for the operator’s connection.
Tensioning must develop along straight sections
The route of the line also affects correct cable operation.
Elastico 10 is designed to operate along straight sections, and the cable is not intended to be diverted around corners in the structure.
When the route changes direction, the line must be interrupted and restarted with a new section oriented in the next direction.
This requirement also directly affects tensioning: each line must be adjusted between its own end points and any intermediate posts, without using the cable to create changes in direction.
The rotating bushing integrated into the post allows any rotation of the Tubo Ancora to be compensated for and Elastico 10 to be correctly oriented in relation to the cable direction, but it does not alter the principle that the line must operate along straight sections.
Component checks maintain effective tensioning
Correct operation of Elastico 10 ultimately depends on the condition of the components involved in tensioning.
The preload screw must be able to operate correctly, the spring must be free to move and the rollers used to guide the cable must not be blocked.
The cable must also be inspected to ensure that there are no broken wires, localised deterioration or clear signs of oxidation.
The cable fixing plate and its corresponding serrated area are also among the components that must be checked.
Periodic inspection therefore concerns not only the general integrity of the post, but directly the components that allow the cable to be installed, tensioned and maintained in the specified configuration.
Elastico 10: tensioning and deformability as part of the same system
In the Elastico 10 system, cable tensioning and post deformability form part of the same operating principle.
Preloading the spring by between 25 and 30 mm allows the line to be prepared; the cable is adjusted while maintaining limited sag and, once fixing has been completed, releasing the spring brings the cable into its operating condition.
Post spacing of between 3 and 10 metres simultaneously affects the overall cable length and the vertical deformation of the line in the event of a fall.
The configuration must therefore be defined by considering anchor geometry, cable length, tensioning, elastic behaviour and available fall clearance together.
This integration allows Elastico 10 to operate as a fall-protection system specifically designed for the installation stages of precast concrete elements.
Discover Elastico 10 and the safety systems for precast concrete elements developed by B.S. Italia to integrate operator protection into the installation stages.
Frequently asked questions about Elastico 10 cable tensioning
How is the Elastico 10 cable tensioned?
The spring integrated into the post is first preloaded by between 25 and 30 mm. Once the cable has been positioned and secured, the preload is released and the spring tensions the cable.
How much sag should the cable have during installation?
During preparation of the line, cable sag must remain below 4 cm from the horizontal.
Does the distance between the posts affect the behaviour of the line?
Yes. Elastico 10 requires post spacing of between 3 and 10 metres, and vertical deflection increases as the distance between the posts increases.
What is the function of the integrated shock absorber?
The shock absorber performs two functions: it contributes to cable tensioning and provides shock absorption within the system in the event of a fall.
Does the Elastico 10 shock absorber replace the operator’s energy absorber?
Not in the standard configuration. The personal system must normally be equipped with an energy absorber compliant with EN 355; a specific exception is provided for a height of 3 metres, post spacing of less than 4 metres and a 1-metre lanyard.